Inauguration and Ceremonial switch-on of the 135-megawatt (MW) Circulating Fluidized Bed Combustion (CFBC) of the Palm Concepcion Power Plant (PCPC) Posted on November 28, 2016 Rizal Hall, Malacañan Palace November 28, 2016